Skip to content
Get a quote

Bridge building team building

  • In teams
  • Outdoors or indoors
  • With wood and rope
  • At the end, you cross it
Bridge building team building: a team in red T-shirts carries their slat bridge together
Bridges
Duration
1 to 3 hours
Group
10 to 550 people
Where
Country estate, garden or large room
Materials
Wood and rope, we bring it all
Final
Crossing the bridge and judging

Bridge building team building is a team activity in which each group puts up a bridge with wood and rope, and at the end someone from the team walks across it. It works because nobody builds bridges at work: there are no experts, so everyone has to plan together before touching a single slat.

It takes place outdoors or in a large room. We only work with companies.

In a nutshell

  • Each team builds its bridge with slats or logs and rope.
  • The materials can be handed over in full or earned through short challenges of wit and skill.
  • At the end, one person from each team crosses their bridge, held steady by their teammates.
  • A jury scores sturdiness, originality and how the work was shared out.

What bridge building for companies looks like

  1. Briefing. The teams are formed and we explain what has to be built, with what materials and how much time there is.

  2. Getting the materials. If there is time, teams earn slats and rope by completing short logic, skill and teamwork challenges. The more they pass, the better the bridge they can build. If time is tight, the materials are handed out at the start.

  3. Planning. Before tying anything, the team agrees on the design and shares out roles. Teams that start building without a plan usually have to take it apart.

  4. Building. Limited time, wood and rope. Some hold, some tie, and someone watches from outside in case it starts to lean.

  5. Crossing. One person from each team walks over their bridge, supported by their teammates.

  6. Jury and awards. The bridges are judged and the winning team receives a certificate.

Bridge building team building: a team raises a structure of logs tied with rope together
Putting up the structure is when you find out whether the plan was any good.

Two types of bridge

BridgeWhat it is made ofWhat it asks of the team
Da Vinci bridgeSlats that lock into each other, secured with ropeUnderstanding the design and assembling in order
Log bridgeLogs, planks and ropeShared effort, knots and coordination

The Da Vinci bridge

It is an arched bridge made of slats that rest on one another. It has no nails: it stays up because of the way the pieces are placed. It looks impossible until someone on the team understands the drawing and explains it to the others.

Bridge building for companies: hands tying the slats of a Da Vinci bridge with rope
In the Da Vinci bridge, each slat holds up the next one.

The log and rope bridge

It is bigger and more physical. The supports go up, the plank walkway is laid across and everything is tied with rope. Several people need to hold things in place at the same time while others tie the knots.

The finale: crossing the bridge

When time is up, one person from each team crosses their bridge. It is no higher than one metre and they cross leaning on their teammates, so there is no risk, but the moment still feels big: it is when you see whether what you built holds up.

The jury looks at three things: that the bridge is sturdy, that it has an idea of its own and that the team made good use of the materials.

Bridge building team building: all the teams pose behind their finished Da Vinci bridges
At the end, all the bridges in a row, with each team standing behind its own.

Get a quote

What the team works on

  • Planning before acting. The most common mistake is to start tying before the design has been agreed.
  • Sharing out resources. Materials are limited, even more so if they have to be earned.
  • Managing time. Every minute that passes is one minute less to reinforce.
  • Trust. At the end, someone on the team climbs onto what you have all built together.

Where it can take place

  • Outdoors. A country estate, a garden or the open area at your offices. This is where it looks best.
  • Indoors. A large hotel or office room, with the Da Vinci bridge, which takes up less space.
Outdoor bridge building for companies: a team assembles its slat bridge on the lawn
In good weather, the lawn of a country estate or of your own offices is the best place.

Who it suits

  • Teams that need to learn to plan together before getting started.
  • Conventions and outdoor days with large groups: every team works on its bridge at the same time.
  • Companies that have already done a scavenger hunt and want something where they build.

If you would rather build with pieces at a table, take a look at Lego team building. If what you want is a race at the end, try racing team building.

Aneta Magdalena, founder of KleverplayPage written by Aneta Magdalena and the Kleverplay team.

Optional and free

Final team report

When it is over, we send you a PDF report if you would like one. It covers the activity and how it went, how the teams finished and who won, the conclusions and the photos of the day.

  • The activity and how it went
  • The teams and the winners
  • The conclusions
  • The photos

Frequently asked questions about bridge building team building

How long does it last and how many people is it for?

Between 1 and 3 hours, depending on whether the materials are earned through challenges, for groups of 10 to 550 people split into teams.

Do you need to be good at DIY?

No. The design is explained at the start and the materials are wood and rope. The hard part is reaching an agreement.

Is crossing the bridge dangerous?

No. It is no higher than one metre and whoever crosses is supported by their teammates.

Can it be done indoors?

Yes, in a large room, with the Da Vinci bridge, which takes up less space. Outdoors it looks better.

What is the Da Vinci bridge?

An arched bridge made of slats that hold each other in place because of the way they are positioned.

Do you organise it for private individuals?

No. We only work with companies and corporate events.

Shall we build a bridge with your team?

With the number of people, the date and the city, we can already suggest something concrete.

Still not sure what to ask for? Try the activity finder: four questions and three ideas.

Phone(+34) 678 60 83 94 · (+34) 91 892 83 26

Emailinfo@kleverplay.com

OfficeCalle de la Princesa de Éboli, 45, 4 C · 28050 Madrid

Aneta will reply in under 12 hours, with three options.

No obligation. We can help you in Spanish or English. We only use your details to reply to you.

Call Get a quote